Water Connection Fees

Residential | Commercial

 Residential Construction        

               New Residence: EFU Charge (Equivalent Fixture Units)

                Less than 30 EFU's       5/8 X 3/4 inch meter             $ 8,122.00

                31 EFU's to 54 EFU's   3/4 inch meter                      $16,244.00

                55 EFU's to 127 EFU's    1 inch meter                      $21,320.00

 

                Remodels or Additions:  If the total EFU's (old + remodel additions)

                exceed existing meter capacity, meter enlargement is required.

                To determine old EFU's you may need to contact the District.

           

                Private Fire Sprinkler System Fee                        $ 8,122.00

                Buildings with floor area greater than 3600 square feet and/or

                with a fire flow of less than 500 g.p.m. are required to have a sprinkler

                system. 

 

                SVFD Fire Protection Fee:                   

                     $500.00/potential bedroom (including lofts, offices, libraries,

                      studies, or dens)

 

                Water Meter:  A Deposit is charged along with the connection

                      fees according to the size of the meter.  In the event that the

                      actual cost is greater than the deposit fee, the difference shall

                      be collected by invoice.

                            Service Connection Size                        Deposit

                                5/8 X 3/4 inch                                    $270.00

                                3/4 inch                                              $290.00

                                1 inch                                                 $355.00

 

                Separate Irrigation Systems:   (Contact District Office)

                   

  Commercial Construction:   

New Construction:

This charge shall be determined by the General Manager on a case-by-case

basis using the formula in District Water Code Section 6.03., paragraph (F), #4.

The applicant shall provide to the District the projected maximum day demand as certified by a qualified Engineer and subject to approval by the District Engineer,

and meter size requested.  The maximum day demand shall be at least equivalent to one single family unit ( 1,000  gpd).

 

Addition or Remodel:  See District Water Code Section 6.03., Paragraph (F), #5.

 

SVFD Fire Protection Fee:  $1,080/1,000 sq. ft. of floor space, per Code

($1.08 per square foot).

Private Fire Sprinkler System Fee: (Plant Availability Charge) per Code.     

 

Water Meter:  A Deposit is charged along with the connection fees according to the size of the meter.

 

Residential | Commercial



  
Change of
   Address Form

  Water Rates

Water Quality Report

      Staff