Sewer Rates

 

For Annual Service Rates, see Section # 6.10 below.

                                  2010-2011 Service Fees

Applicable 

Sewer Code    

Section #    Description                        Fee

 

6.01   Plan Checking Fee                        Actual Cost to District

                     Deposit Amounts:

                         Single Family Unit                $   50.00

                         All Other Uses                     $ 500.00

 

6.02   Sewer Construction Permit Fee Actual Cost to District

 

6.03   Connection Charges                    Hook-up+Fixture Unit+

                                                                      Tapping Fees

          Hook-up Unit Fee                                $1,211.00

          Fixture Unit Fee                                    $    55.00

          Tapping Fee                                         Actual Cost to District

 

6.05    Sewer Line Easement 

                   Processing Fee               Actual Cost to District

6.06    Application Fee                            $   0.00

 

6.07    Special Study Preparation

                or Checking Fee                Actual Cost to District

 

6.08    Cesspool Truck Disposal Fee         $ 100.00/1,000 gallons

                                                                        plus T-TSA Charges

 

6.10C  Annual Service Charges for Sewer Service

           Residential Service Fees:

            Single Family Unit    

             a) Base Rate-Flat Rate:                    $311.50/year ($25.96/mo)

           Residential Condominium Unit (individually metered)

               a) Base Rate-Flat Rate:                  $311.50/year ($25.96/mo)

            Multi-Family Residential :            $261.50/year per unit ($21.79/mo)

            Condominiums (Master-Metered):$261.50/year/unit ($21.79/mo)

           Residential Pool:  Base-Flat Rate:   $444.00/year (37.00/mo)

        

          Commercial Service Fees

          Commercial/Industrial Rate

            a) Base Rates (based on metered water use 5/1/09-4/30/10) 

                a minimum of  75,000 gallons use      $552.66

            b) Consumption Rate:  Water consumption

                over 75,001 gallons                          $ 7.37/1,000 gallons

    

6.10F  Temporary Sewage Disposal Fee (Permit Required 

              with Tahoe Truckee Sanitation Agency as well as SVPSD)

    SVPSD Permit: Deposit Required       $100.00 

        A) Temporary Service 

            Establishment Fee    $ 50.00

        B) Inspection Fee        $ 50.00 per trip

     

    Temporary Sewage Disposal Fee       $2.50/1,000 gallons

      (T-TSA Fee also applicable)

6.11E    Lateral Testing Fee                          Actual Cost to District

 

9.12      Disconnection/Reconnection             $50.00 ea.



  
Connection Fees

  Billing & Payment

  Permits

  Staff